Pictured is the old bridge that was replaced, which had been given a low load rating in recent months. |
The local contractor replacing a bridge over Olive Branch Creek on the south end of the road completed the project ahead of schedule.
The road had been closed since Feb. 10.
M&G Services of Marion won the bid to replace the bridge.