Friday, March 27, 2015

Cave In Rock Ferry re-opening Saturday

This photo was taken the day the ferry
closed, earlier this month.
Floodwaters on the Ohio River have dropped sufficiently to allow the Cave In Rock Ferry to resume operation starting at 6 a.m., Saturday, March 28.

Rising floodwaters forced the ferry to halt operations March 12.  Ferry Operator Lonnie Lewis says the ferry crew has taken advantage of the break to perform maintenance and even do some painting on the boat and barge.